Saturday 3 June 2017

New Triradial Genoa


So. There are some things I do spend money on:

Raasay - New Genoa

Raasay's old sails set well, and I was spoiled.

Harbour Double

Raasay has a fairly primitive layout. Only pipe cots in the main saloon, quite a cramped fo'c'sle, and a very tiny pipe-cot in the quarter berth space behind the chart table.

Without doing a lot of remodelling, or incurring a lot of expense, I wanted to create a temporary double in the main saloon, but wanted the bits to be easy to stow.

This is the result - it uses the port side settee cushions plus a squab from a cockpit cushion to make the additional mattress. The long support by the table can be stowed in the quarter berth space, and the slats roll up quite neatly with their webbing.


Raasay - Harbour Berth

Raasay in the yard, near launch ...

Last tasks before being lifted. Angus touching up the touching up ...

2017-04-02 12.37.17.jpg

Varnish ...

Some new/refurbished items. The old locker lid was on the point of failure, and I had this nice piece of mahogany ... The cockpit step is fr...